Architectural decisions for the UBML notation. This document records significant design choices about the language’s abstractions, vocabulary, and structure — and the reasoning behind them.


Purpose

UBML must remain focused and coherent. Every abstraction we add, every property we define, every relationship we model makes the language either clearer or more confusing for consultants trying to capture business reality.

This document preserves institutional knowledge about why UBML is designed the way it is. It explains:

Before modifying the language, maintainers must:

  1. Read the relevant decision record
  2. Understand the constraints that shaped the original design
  3. Consider whether those constraints still apply
  4. Update this document if the decision changes

Do not change the notation without updating this document.


Decision Record Format

Each decision follows this structure:


DD-001: Cross-Process Invocation

Status: Accepted

Context

Business processes often invoke other processes. We needed to model:

  1. Synchronous subprocess calls — “Run this process and wait for it to finish”
  2. Asynchronous triggers — “Fire off this process when I complete, but don’t wait”

The original design had multiple mechanisms:

Mechanism Location Problem
Step.processRef On the step Only for sync calls
Process.triggers At process level Not visible when reading the step
Link with process target Links section Third way to express same concept

This violated P1 (Single Source of Truth) and P9.1 (No Alternative Representations).

Research

We examined how formal standards handle this:

BPMN 2.0

Concept BPMN Element Where Defined
Sync subprocess call Call Activity ON the activity
Async trigger Signal/Message Throw Event Attached to or following activity

Key insight from Bruce Silver (Method and Style): “The flow contained in a call activity is an independently-defined process. The called process reference is ON the call activity element.”

ArchiMate

Concept ArchiMate Element
Process composition Composition relationship
Process triggering Triggering relationship (from → to)

ArchiMate draws triggering relationships FROM the triggering element. You see the relationship by looking at either end.

Expert Opinions on Complexity

Sebastian Stein (ARIS/Software AG):

“BPMN contains many redundant modelling elements… I think this redundancy makes BPMN too complex for no reason. There should be exactly one way to express [a concept] and not several.”

Håvard Jørgensen (Simplifying BPMN 2.0):

“One way to express a thing means one pattern to learn, one pattern to parse, one pattern to validate. Alternatives create cognitive load and tooling complexity.”

Decision

Consolidate all cross-process invocation into a single calls property on Step, with explicit mode to distinguish synchronous vs asynchronous invocation.

steps:
  ST00015:
    name: Run credit check
    calls:
      - process: PR00020
        mode: sync  # Waits for completion
  
  ST00016:
    name: Approve order
    calls:
      - process: PR00030
        mode: async
        on: complete  # Fires on completion, doesn't wait
      - process: PR00040
        mode: async
        on: error
        condition: "severity == 'critical'"

Semantics

Mode Behavior BPMN Projection
mode: sync Synchronous call, step waits for subprocess Call Activity
mode: async + on: complete Async trigger on completion Intermediate Signal Throw Event
mode: async + on: error Async trigger on error Intermediate Error Throw Event

Call Object Properties

Property Required Description
process ✓ Yes ProcessRef — which process to invoke
mode ✓ Yes sync or async — whether step waits for completion
on When async Event that fires the call: complete, error, timeout
condition No Guard expression — call only if true

Alternatives Rejected

Alternative Approach Why Rejected
A Separate processRef (sync) and triggers (async) properties Two properties for same concept. Violates P9.1.
B Use Links with process targets Step doesn’t show what it triggers. Links are for intra-process flow.
C Process.triggers at process level When reading a step, you don’t see it triggers anything.
D Scalar shorthand calls: PR00020 Two syntaxes for same thing. Violates P9.1.

Consequences

  1. Schema changes:
    • Add calls property to Step (array of ProcessCall)
    • Add ProcessCall type definition
    • Remove processRef from Step
    • Remove triggers from Process
    • Remove ProcessTrigger type
  2. Validation changes:
    • Validate calls[].process resolves to valid ProcessRef
    • Check for cycles in call chains (optional)
  3. Projection mapping:
    • mode: sync → BPMN Call Activity
    • mode: async + on: complete → BPMN Intermediate Signal Throw Event
    • mode: async + on: error → BPMN Intermediate Error Throw Event

Principles Applied

Principle How Applied
P1.1 No Dual Hierarchy Single mechanism for cross-process invocation
P4.1 Semantic Properties Required mode property explicitly distinguishes sync/async
P4.4 No Hidden Defaults mode is required, no inference from property presence
P6.1 Business Vocabulary First calls is natural language (“this step calls that process”)
P9.1 No Alternative Representations One syntax: calls: [{process: ..., mode: ...}]
P10.1 Element Types as Semantic Primitives Clear mapping to BPMN Call Activity and Events

Status: Accepted

Context

Links model relationships between steps. We needed to clarify their scope.

Decision

Links connect steps within the same process only. They do not cross process boundaries.

# Valid: step to step
links:
  - from: ST00001
    to: ST00002

# Invalid: step to process (use calls instead)
links:
  - from: ST00001
    to: PR00002  # ❌ Not allowed

Rationale

  1. Semantic clarity: Links = routing/flow, Calls = process invocation
  2. BPMN alignment: Sequence flows connect activities within a pool
  3. Single source of truth: Cross-process invocation handled by calls

Consequences

Principles Applied

Principle How Applied
P9.1 No Alternative Representations Links for flow, calls for invocation
P10.1 Element Types as Semantic Primitives Links → BPMN Sequence Flow

DD-003: Step Grouping and Nesting

Status: Accepted

Context

Analysts need to group steps for different purposes:

  1. Organizational view: “Which phase/stage is this step in?”
  2. Execution semantics: “Do these steps run in parallel? In a loop?”
  3. Process reuse: “This step invokes a whole other process”

We needed a clear, non-overlapping design that handles all cases without giving analysts multiple ways to achieve the same outcome.

Decision

UBML provides three distinct mechanisms for step grouping, each with a unique purpose:

Mechanism ID Pattern Purpose Execution Effect
Phases PH##### Organizational overlay None (metadata)
Blocks BK##### Execution control flow Yes (par, alt, loop, opt)
calls (on Step) Cross-process invocation Yes (sync/async)

Phases — “What stage is this step in?”

Phases provide an organizational overlay without affecting execution. Use for lifecycle stages, delivery phases, and reporting views.

phases:
  PH00001:
    name: "Discovery Phase"
    kind: lifecycle
    includeSteps: [ST00001, ST00002, ST00003]
  
  PH00002:
    name: "MVP Scope"
    kind: delivery
    startMilestone: ST00010
    endMilestone: ST00050

BPMN Projection: Swimlane backgrounds or collapsible groups (visual only)

Blocks — “How do these steps execute together?”

Blocks define execution semantics: parallel, alternative, optional, loop.

blocks:
  BK00001:
    name: "Parallel Inspections"
    operator: par
    steps: [ST00010, ST00011, ST00012]
  
  BK00002:
    name: "Priority Routing"
    operator: alt
    operands:
      BK00003:
        guard: "priority == 'urgent'"
        steps: [ST00020]
      BK00004:
        guard: "priority == 'normal'"
        steps: [ST00021]
  
  BK00005:
    name: "Quality Loop"
    operator: loop
    guard: "qualityScore < 0.95"
    maxIterations: 5
    steps: [ST00030, ST00031]

BPMN Projection:

Parallel Execution in Detail

UBML supports parallelism at two levels:

1. Parallel Steps (within a process)

Use operator: par on a Block to run steps concurrently:

# Process with parallel inspections
PR00001:
  name: "Building Inspection"
  steps:
    ST00001: { name: "Schedule Inspection", kind: action }
    ST00010: { name: "Electrical Inspection", kind: action }
    ST00011: { name: "Plumbing Inspection", kind: action }
    ST00012: { name: "Structural Inspection", kind: action }
    ST00020: { name: "Compile Report", kind: action }
  
  blocks:
    BK00001:
      name: "Parallel Inspections"
      operator: par
      steps: [ST00010, ST00011, ST00012]
  
  links:
    - from: ST00001
      to: BK00001      # Link TO the block (fork point)
    - from: BK00001
      to: ST00020      # Link FROM the block (join point)

BPMN Projection:

[Schedule] → ◇(+) → [Electrical]  → ◇(+) → [Compile]
                  → [Plumbing]   ↗
                  → [Structural] ↗
           (fork)              (join)

2. Parallel Processes (cross-process)

Use calls with on: complete to trigger processes asynchronously:

ST00100:
  name: "Order Confirmed"
  kind: action
  calls:
    - process: PR00010  # Sync: Inventory Check (must complete)
    - process: PR00020
      on: complete      # Async: Notification (fires and continues)
    - process: PR00030
      on: complete      # Async: Analytics (fires and continues)

BPMN Projection:

[Order Confirmed] → [Inventory Check (Call Activity)]
                  → ○⟩ Signal: Trigger PR00020
                  → ○⟩ Signal: Trigger PR00030

Projection to Standard Diagrams

UBML Construct BPMN 2.0 ArchiMate EPC
Block with operator: par Parallel Gateway (AND) fork/join Triggering relationship (parallel) AND connector
Block with operator: alt Exclusive Gateway (XOR) Junction with OR XOR connector
Block with operator: opt Exclusive Gateway with empty path Junction (optional path) XOR with skip
Block with operator: loop Loop marker on activity N/A (use composition) Loop connector
calls (sync) Call Activity Triggering relationship Process interface
calls with on: (async) Signal Throw Event Flow relationship Event-driven chain

Nested Parallelism

Blocks can contain nested blocks via operands:

blocks:
  BK00001:
    name: "Main Parallel Work"
    operator: par
    operands:
      BK00002:
        name: "Documentation Track"
        operator: seq
        steps: [ST00010, ST00011]
      BK00003:
        name: "Technical Track"
        operator: seq
        steps: [ST00020, ST00021, ST00022]

BPMN Projection:

     ◇(+) → [ST00010] → [ST00011] → ◇(+)
(fork)                              (join)
     ◇(+) → [ST00020] → [ST00021] → [ST00022] → ◇(+)

calls — “What process does this step invoke?”

Cross-process invocation is handled via the calls property on individual steps (see DD-001).

ST00100:
  name: "Onboard Customer"
  kind: action
  calls:
    - process: PR00050  # Sync: waits for completion

BPMN Projection: Call Activity

Why No Inline Nested Steps

We do NOT support inline step definitions (e.g., steps: nested inside a step).

Reasons:

  1. Creates a third way to group (alongside Blocks and Phases)
  2. Inline steps aren’t reusable — logic is “trapped”
  3. Forces analyst to decide: inline vs. separate file?
  4. Blocks already handle execution grouping with richer operators (par, alt, loop)

Instead: Create a separate process and reference it via calls.

When to Create a Separate Process

Use this decision tree:

Is this work reused in multiple places?
  YES → Separate process + calls
  NO  ↓

Does it have its own lifecycle (versions, ownership, SLAs)?
  YES → Separate process + calls
  NO  ↓

Is it complex enough to warrant its own diagram?
  YES → Separate process + calls
  NO  ↓

Does it involve a different team/department?
  YES → Separate process + calls
  NO  → Keep steps in current process (use Blocks if needed)

Examples

Scenario Recommendation Why
Credit check used by 3 loan products Separate process Reused across products
IT provisioning for new hires Separate process Owned by IT, has own SLA
15-step quality inspection Separate process Complex enough for own diagram
3-step approval within a request Keep inline Simple, not reused
Parallel document reviews Block (par) Execution grouping, same process
Steps in “Phase 1” vs “Phase 2” Phases Organizational view only

Granularity Guidance

Too Fine Right Level Too Coarse
“Send Email” as separate process “Customer Notification” process with email, SMS, push steps Entire “Order to Cash” in one file
“Validate Field X” as separate process “Order Validation” process with all validations All company processes in one file

Rule of thumb: A process should be understandable in one diagram view (15-30 steps max). If larger, split by subprocess calls.

Step Kinds

With grouping handled by Phases, Blocks, and calls, step kinds focus on individual step semantics:

Kind Meaning BPMN Projection
action Work that transforms inputs to outputs Task
decision Routing choice with multiple outcomes Exclusive Gateway
milestone Significant checkpoint (zero duration) Intermediate None Event
wait Pause for external event or time Intermediate Catch Event
handoff Transfer to another team/actor Task with lane change
start Process entry point Start Event
end Process exit point End Event

Additional behaviors (approval, review, notification) are modeled as properties on steps, not as additional kinds (P10.2).

Principles Applied

Principle How Applied
P1.1 No Dual Hierarchy Each grouping need has exactly one mechanism
P9.1 No Alternative Representations No choice between inline/external for nesting
P10.1 Element Types as Semantic Primitives Phases, Blocks, Steps each have clear BPMN mapping
P10.2 Behavioral Richness via Properties Approval, review = properties, not kinds

DD-004: Why No Shorthand Syntaxes

Status: Accepted

Context

Developers often request shorthand syntaxes for convenience (e.g., scalar instead of array, abbreviated property names). We reject all such requests.

Decision

UBML provides exactly one syntax for each concept. No shorthands.

Rationale

From P9.1:

“One way to express a thing means one pattern to learn, one pattern to parse, one pattern to validate.”

Costs of shorthands:

  1. Users must learn multiple patterns
  2. Tooling must parse multiple patterns
  3. Validation must handle multiple patterns
  4. Docs must explain multiple patterns
  5. AI assistants generate inconsistent output

Benefits of shorthands:

  1. Fewer keystrokes

The benefits don’t justify the costs.

Consequences

Principles Applied

Principle How Applied
P9.1 No Alternative Representations One syntax only
P9.2 No Shorthand Properties Canonical form exclusively

DD-005: Process Isolation and Cross-Process Coordination

Status: Accepted

Context

When modeling systems with multiple processes, analysts need to express cross-process relationships:

The question: how should cross-process coordination be expressed?

Decision

Steps are isolated within their process. Cross-process coordination uses the calls property on steps — the only mechanism for process-to-process relationships.

What’s Supported

Relationship Mechanism BPMN Projection
Step → Step (same process) links array Sequence Flow
Step invokes Process (sync) calls: [{process: PR###}] Call Activity
Step triggers Process (async) calls: [{process: PR###, on: complete}] Signal Throw Event

What’s NOT Supported

Why No Program-Level Dependencies?

We considered adding process-to-process scheduling (FS, SS, FF, SF) at a “program” level but rejected it:

Issue Principle Violated
Creates second way to express cross-process (alongside calls) P9.1 No Alternative Representations
No BPMN equivalent for process-to-process scheduling P10.5 New Primitives Require Projection
BPMN uses Message Flows to pool boundaries, not task-to-task P10.1 Element Types as Semantic Primitives
Redundant with calls semantics P1 Single Source of Truth

Why No Cross-Process Step References?

Problem Impact
Breaks encapsulation Process internals become external contracts
Tight coupling Can’t refactor steps without checking all other processes
BPMN incompatible BPMN connects pools via message events, not task-to-task
Projection complexity ArchiMate, EPC don’t model cross-pool step links

BPMN Pattern

┌─────────────────────────────────────────────────┐
│ Pool A (Process 1)                              │
│ [Task A] → [Task B] → ○) Signal Throw           │
└─────────────────────────────────────────────────┘
                              ↓ (signal)
┌─────────────────────────────────────────────────┐
│ Pool B (Process 2)                              │
│                     (○ Signal Catch → [Task C]  │
└─────────────────────────────────────────────────┘

Cross-process coordination happens through events, not direct task links. UBML’s calls with on: maps directly to this pattern.

Consequences

  1. Processes are self-contained — can be moved, reused, versioned independently
  2. Single mechanism — only calls for cross-process, no alternatives
  3. Clean projection — maps directly to BPMN Call Activity / Signal Events
  4. Scheduling within process — FS, SS, FF, SF via links, not across processes

Principles Applied

Principle How Applied
P1.1 No Dual Hierarchy Process is the encapsulation boundary
P9.1 No Alternative Representations Only calls for cross-process
P10.1 Element Types as Semantic Primitives Process = Pool, clean separation
P10.5 New Primitives Require Projection No constructs without BPMN mapping

DD-006: Template-Instance Separation

Status: Accepted

Context

UBML is used for both:

  1. Repeatable processes — Insurance claims, order fulfillment (many instances/day)
  2. Project methodologies — Construction, consulting engagements (unique instances)

The question: should UBML model templates or instances?

Decision

UBML models templates (methodologies), not instances (executions).

┌─────────────────────────────────────────────────────────────────────┐
│ UBML = TEMPLATE LAYER                                               │
│ "Build House" process with steps, durations, dependencies           │
└─────────────────────────────────────────────────────────────────────┘
                          ↓ Export / Instantiate
┌─────────────────────────────────────────────────────────────────────┐
│ OPERATIONAL LAYER (MS Project, BPMS, etc.)                          │
│ "123 Oak Street" project with actual dates, crews, % complete       │
└─────────────────────────────────────────────────────────────────────┘

What UBML Models (Template)

Concern In UBML
Steps and their sequence ✅ Yes
Base durations and effort ✅ Yes
Dependencies (FS, SS, FF, SF) ✅ Yes
Roles (RACI) ✅ Yes
Skills required ✅ Yes
Costs (rates, fixed costs) ✅ Yes
Conditions and routing ✅ Yes

What UBML Does NOT Model (Instance)

Concern Why Not Where It Lives
Actual calendar dates P10.4 — Operational data MS Project, BPMS
Specific person assignment P10.4 — Roles vs persons HR/Resource systems
% Complete tracking Execution state BPMS, Project tools
Resource leveling Portfolio concern MS Project
Actual vs planned Execution tracking Process mining, BI

Value for Project-Centric Customers

For customers whose business is managing projects (construction, consulting), UBML provides:

  1. Project Methodology Library — standardized templates for project types
  2. Documented Dependencies — FS, SS, FF, SF with lag already in schema
  3. Skill/Resource Requirements — who needs to be available
  4. Quality Gates — approvals, reviews as step properties
  5. Export to MS Project — instantiate template with actual dates

Rationale

Mixing templates and instances creates:

Clean separation follows P10.4: “Separation of Modeling and Operational Concerns”

Principles Applied

Principle How Applied
P10.4 Separation of Modeling and Operational Templates in UBML, instances in tooling
P7.1 Lossless Round-Trip Not Required Export to MS Project is intentionally one-way

DD-007: Scenarios for Business Situation Modeling

Status: Accepted

Context

Consulting engagements require:

  1. Understanding the current business situation (volumes, case mix, costs)
  2. Building business cases for proposed changes
  3. Calculating ROI for change initiatives
  4. Validating models against process mining data

The question: how do analysts describe typical business situations in UBML?

Decision

Scenarios describe typical business situations that enable ROI and business case analysis. They capture:

┌─────────────────────────────────────────────────────────────────────┐
│ SCENARIO — Typical Business Situation                               │
├─────────────────────────────────────────────────────────────────────┤
│ Work Mix:       Standard (70%), Complex (20%), Expedited (10%)      │
│ Arrivals:       127/day, Poisson, Q4 +20% seasonality               │
│ Attributes:     Region (North/South/West), Order Value ($0-50k)     │
│ Evidence:       Step X takes 45min (Celonis, 95% confidence)        │
└─────────────────────────────────────────────────────────────────────┘
                                    +
┌─────────────────────────────────────────────────────────────────────┐
│ HYPOTHESIS — Proposed Change                                        │
├─────────────────────────────────────────────────────────────────────┤
│ SCQH:    "Order processing takes 5 days; customers expect 2"        │
│ Hypothesis: "Automate data entry to save 0.5 days"                  │
│ Impact:   Step ST00010: duration 45min → 5min                       │
└─────────────────────────────────────────────────────────────────────┘
                                    ↓
┌─────────────────────────────────────────────────────────────────────┐
│ BUSINESS CASE — Scenario + Hypothesis                               │
├─────────────────────────────────────────────────────────────────────┤
│ Current cost per case:  $42 (from scenario simulation)              │
│ Proposed cost per case: $28 (applying hypothesis)                   │
│ Annual volume:          46,355 cases (127/day × 365)                │
│ Annual savings:         $650k                                       │
│ Implementation cost:    $200k                                       │
│ ROI:                    225% first year                             │
└─────────────────────────────────────────────────────────────────────┘

Two Complementary Purposes

Component Purpose Contains
Scenario Describe typical situations Work mix, arrivals, attributes, evidence
Hypothesis Propose changes SCQH framing, hypothesis trees, recommendations
Together Calculate ROI Current state (scenario) vs. future state (scenario + hypothesis)

Scenarios enable “what-if” analysis:

Hypotheses enable structured reasoning:

Scenario Structure

Scenarios describe the business reality that processes operate within:

scenarios:
  SC00001:
    name: "Current State (2024)"
    description: "Baseline from process mining data"
    
    # What types of work exist?
    workMix:
      - name: "Standard Order"
        probability: 0.72
        description: "Orders under $10k, single approval"
      - name: "Complex Order"
        probability: 0.18
        description: "Orders over $10k, requires VP approval"
      - name: "Return/Refund"
        probability: 0.10
        description: "Customer returns and refund processing"
    
    # How does work arrive?
    arrivals:
      pattern: poisson
      rate: 127
      rateUnit: per-day
      seasonality:
        Q1: 0.85
        Q4: 1.20
    
    # What varies across cases?
    workAttributes:
      region:
        type: categorical
        values:
          - { name: North, probability: 0.3 }
          - { name: South, probability: 0.5 }
          - { name: West, probability: 0.2 }
      orderValue:
        type: numeric
        distribution: lognormal
        mean: 5000
        stdDev: 3000
    
    # What did we observe?
    evidence:
      - type: duration
        step: ST00010
        metric: processingTime
        value: "45min"
        source: "Celonis - median 2024"
        confidence: 0.95
    
    simulationConfig:
      runLength: "90d"
      replications: 20

Hypothesis Structure

Hypotheses use the SCQH framework (Situation-Complication-Question-Hypothesis) from management consulting:

hypotheses:
  HT00001:
    name: "Order Processing Improvement"
    
    scqh:
      situation: "Order processing averages 5 days end-to-end"
      complication: "Customers expect 2-day delivery"
      question: "How can we reduce processing to 2 days?"
      hypothesis: "Automate data entry and streamline approvals"
    
    root:
      HY00001:
        text: "We can achieve 2-day processing"
        operator: and
        children:
          - id: HY00002
            text: "Approval delays can be reduced by 2 days"
            type: hypothesis
            status: validated
            confidence: 0.85
          - id: HY00003
            text: "Automation saves 0.5 days on data entry"
            type: hypothesis
            status: untested

Connecting Scenarios and Hypotheses

For ROI analysis, create scenario variants that reflect hypothesis outcomes:

scenarios:
  SC00001:
    name: "Current State"
    description: "Baseline situation"
    # ... full definition
  
  SC00002:
    name: "Post-Automation"
    description: "After implementing HT00001 hypothesis"
    basedOn: SC00001
    evidence:
      - type: duration
        step: ST00010
        metric: processingTime
        value: "5min"  # Was 45min, now automated
        source: "Projected (vendor benchmark)"
        confidence: 0.70

Business case flow:

  1. Define current state scenario (SC00001) with evidence
  2. Simulate to establish baseline metrics
  3. Create hypothesis with proposed change
  4. Create future scenario (SC00002) applying hypothesis
  5. Simulate future scenario
  6. Calculate ROI = (Baseline cost - Future cost) × Volume

Process Mining Integration

The evidence array grounds scenarios in observed reality:

evidence:
  # Step-level measurements (from mining)
  - type: duration
    step: ST00020
    metric: processingTime
    value: "2.5h"
    source: "Celonis export - P50"
    confidence: 0.90
  
  - type: duration
    step: ST00020
    metric: waitTime
    value: "18h"
    source: "Celonis export - P50"
    confidence: 0.85
  
  # Process-level measurements
  - type: count
    process: PR00001
    metric: dailyVolume
    value: 127
    period: "2024-01"
    source: "Mining dashboard"
  
  # Cost measurements
  - type: cost
    step: ST00010
    metric: laborCost
    value: 42.50
    source: "Finance team estimate"
    confidence: 0.70

Evidence confidence levels:

Scenario Variants for What-If Analysis

Use basedOn for efficient variant modeling:

scenarios:
  SC00001:
    name: "Current State"
    # ... full baseline
  
  SC00002:
    name: "2x Volume Growth"
    description: "What if demand doubles?"
    basedOn: SC00001
    arrivals: { pattern: poisson, rate: 254, rateUnit: per-day }
  
  SC00003:
    name: "After RPA Implementation"
    description: "Applying automation hypothesis HT00001"
    basedOn: SC00001
    evidence:
      - type: duration
        step: ST00010
        metric: processingTime
        value: "5min"  # Was 45min before RPA
        source: "Vendor benchmark"
  
  SC00004:
    name: "Pessimistic (Seasonality Spike)"
    description: "What if Q4 demand increases 50%?"
    basedOn: SC00001
    arrivals:
      pattern: poisson
      rate: 127
      rateUnit: per-day
      seasonality: { Q1: 0.85, Q4: 1.50 }  # More extreme Q4

Why Scenarios Separate from Processes?

If in Process Problem
Work mix Template becomes situation-specific, not reusable
Arrival rates Brisbane != Melbourne != Sydney
Mining evidence Process cluttered with historical observations
Simulation config Tooling concerns leak into model

Separation enables:

Principles Applied

Principle How Applied
P10.4 Separation of Modeling and Operational Scenario = business situation, Process = template
P7.2 Import Should Enrich Mining data enriches via evidence, not by changing process
P3.2 References for Cross-Cutting Scenarios reference processes, don’t contain them
P3.5 Coherent Model Boundaries Scenarios + Hypotheses enable focused ROI analysis

DD-008: Knowledge Architecture — Sources and Insights

Status: Accepted (v1.3)

Context

Consulting engagements generate vast amounts of unstructured knowledge: interview transcripts, meeting notes, documents, emails, surveys, corridor conversations, research findings. This knowledge feeds into the UBML model but has no formal place in the language.

Without a knowledge layer:

UBML workspaces are intended as long-lived digital twins of organizations (5+ years). They need a systematic way to catalog information sources and the insights derived from them.

Research

Management consulting firms universally use layered knowledge capture:

Pattern Flow
McKinsey Interview notes → Key findings → Implications → Recommendations
BCG Data room → Fact pack → Insight cards → Hypothesis tree
Bain Source interviews → Issue trees → Validated/invalidated branches

Common pattern: Raw sources → Atomic insights → Structured analysis. Always traceable.

UBML’s existing typed reference system (ID prefixes + cross-references) already forms a lightweight knowledge graph. The knowledge layer extends it with two new node types rather than introducing separate infrastructure.

Decision

Three-Layer Truth Architecture

UBML adopts a three-layer model for organizational knowledge:

Layer Purpose ID Pattern
Sources Catalog of where information comes from SR#####
Insights Atomic derived knowledge with human-readable context IN#####
Model Interpreted structures (processes, actors, entities…) existing IDs

Each layer references the one below. Model elements reference insights via derivedFrom. Insights reference sources. This enables traceability from any model element back to its origin.

Source (SR#####)

A catalog entry for where information came from. Metadata only — actual content lives in companion files or external URLs (per P12.2).

sources:
  SR00001:
    name: "Interview with Warehouse Manager"
    type: interview
    date: "2026-01-15"
    participants: [AC00010, "Jan Novák (external)"]
    description: "90-minute deep dive on order processing pain points"
    tags: [order-processing, warehouse]
    file: "./transcripts/2026-01-15-warehouse-manager.md"

Required properties: name only. Everything else optional (P5.2).

Source types: interview, meeting, workshop, document, email, survey, observation, system-export, research

Insight (IN#####)

An atomic piece of derived knowledge. Carries enough context to be understood in isolation, years after capture (P12.5).

insights:
  IN00001:
    text: "Warehouse staff spend 2 hours daily on manual data entry across SAP, Excel, and the legacy portal"
    kind: pain
    status: validated
    source: SR00001
    attribution: "Karel Dvořák, Warehouse Manager"
    date: "2026-01-15"
    confidence: 0.85
    about: [AC00010, EN00005]
    context: |
      Mentioned during discussion about daily routines. Karel demonstrated
      the three-system workflow on his screen. Visibly frustrated.
    tags: [data-entry, manual-work]
    related: [IN00002, IN00005]
    supersedes: IN00042

Required properties: text only. A consultant in a rush can write:

  IN00099:
    text: "CFO mentioned budget freeze until Q3"

Insight kinds: pain, opportunity, process-fact, stakeholder, decision, risk, assumption, constraint

Status lifecycle: proposedvalidated disputed retired

Linking to Model (derivedFrom)

Model elements gain an optional derivedFrom property (on Step, Actor, Entity, Process, HypothesisNode, KPI):

steps:
  ST00015:
    name: "Enter Order Data into SAP"
    kind: action
    derivedFrom: [IN00001, IN00003]

Why No “Evidence” Middle Layer

The original plan proposed: Source → Evidence → Claim, where Evidence was a precise pointer (line number, timestamp) into a source document.

Problem Impact
Brittle references Editing a transcript shifts all line numbers
High authoring friction Extra record for every insight, little value to readers
Maintenance burden Over 5 years, hundreds of pointers would go stale

Instead, each Insight carries a human-readable context field. Context survives reformatting, editing, and the passage of time. Precise pointers do not.

Terminology: “Evidence” in UBML

The word “evidence” appears in UBML with clear, non-overlapping meanings:

Location Meaning
HypothesisNode.type: evidence Enum value — a hypothesis node backed by evidence
HypothesisNode.evidence Free-text string — human-readable evidence description

Quantitative measurements on Scenarios use the term observations (type Observation). The knowledge layer uses SourceRef (SR#####) and InsightRef (IN#####) for structured traceability.

Terminology: “Insight” over “Claim”

Term Pros Cons
Insight Natural consultant vocabulary, used in deliverables Slightly implies positive discovery
Claim Precise in knowledge management Adversarial/legal tone
Finding Natural in formal reports Too formal for capture mode

Decision: Insight (IN#####) — matches how consultants talk and works in both quick capture and formal reports.

Alternatives Rejected

Alternative Why Rejected
Source → Evidence → Claim (three-element chain) Brittle references, high friction, maintenance burden (see above)
Single layer (no Sources) No traceability, can’t audit where knowledge came from
Free-text markdown notes Not structured enough for cross-referencing or AI assistance
Computed index as source of truth Violates P1.3 (No Computed Aggregations)
Strict required fields on insights Violates P5.2 and P12.1

Consequences

  1. New types: Source, Insight, SourceRef (SR#####), InsightRef (IN#####)
  2. New document schemas: *.sources.ubml.yaml, *.insights.ubml.yaml
  3. Modified types: derivedFrom property added to core model types
  4. Scenario property: observations (type Observation) for quantitative measurements
  5. New file patterns: *.sources.ubml.yaml, *.insights.ubml.yaml
  6. Deferred: LLM extraction, indexing/caching — see plan/00-design-decisions.md (deferred items) and plan/18-future.md

Principles Applied

Principle How Applied
P1.1 Single Source of Truth Each insight exists once; model elements reference, not duplicate
P5.2 Required Properties Minimal Only text required on Insight; only name required on Source
P6.1 Business Vocabulary First “Insight” not “Claim”; “Source” not “Provenance”
P9.1 No Alternative Representations One way to capture knowledge
P12 Knowledge Capture Minimal friction, catalog sources, append-friendly, layered truth, context over precision

References

External Sources

Internal Documents


DD-009: CLI Accepts Only Canonical Format

Status: Accepted

Context

Users sometimes expect forgiving input: “90 days” instead of “90d”, “2 hours” instead of “2h”. This creates tension between usability (accept what users type) and P9.1 (No Alternative Representations).

Decision

CLI tooling must accept only the canonical format defined in the schema.

When a user provides an invalid format, the CLI must reject it with a clear error message showing the correct format:

Invalid duration '90 days'. Use: 90d, 2h, 30min, 1wk, 3mo
Run 'ubml help durations' for format details.

The CLI must not silently normalize alternative inputs (“90 days” → “90d”).

Rationale

Approach Pros Cons
Strict (chosen) Users learn canonical format; no hidden conversions; tooling stays simple Requires users to learn format
Lenient normalization Feels forgiving Creates two valid input surfaces; obscures canonical format; adds parser complexity; invites scope creep (“support more natural language!”)

P9.1 applies at all input surfaces. Accepting alternative forms at the CLI contradicts the principle just as much as accepting them in YAML files.

The vision’s “forgiving during capture, rigorous when needed” refers to schema validation strictness (draft/standard/strict modes), not format leniency. Users can start with incomplete models (missing optional properties), but the properties they do provide must use canonical syntax.

Alternatives Rejected

Alternative Why Rejected
Accept natural language, normalize before writing Creates complexity creep. Where does it stop? “one and a half days”? “about 2 hours”?
Accept both, warn on non-canonical Still two valid forms. Warning fatigue leads to ignoring warnings.
Strict in files, lenient in CLI Inconsistent. Users copy-paste from CLI to files and get validation errors.

Consequences

  1. Error messages must be excellent — users will hit format errors frequently at first. Messages must show examples and link to help.
  2. Help topics requiredubml help durations, ubml help references, etc.
  3. Documentation must be clear — format specs easily discoverable.

Principles Applied

Principle How Applied
P9.1 No Alternative Representations One format, everywhere — schema, CLI, docs

DD-010: Typed References Only — No String Alternatives

Status: Accepted

Context

When properties refer to concepts that have their own element types in the workspace (actors, processes, sources, insights, entities), there are two possible approaches:

  1. Use the typed reference (ActorRef, ProcessRef, SourceRef, etc.)
  2. Accept a plain string, either exclusively or as a union (oneOf: [Ref, string])

Strings can’t be traced, validated, queried, or deduplicated. They create parallel identity systems where the same real-world thing exists as both a typed element and an unlinked text fragment.

Decision

Every property that refers to a modeled concept must use the corresponding typed reference. No string alternatives.

This applies uniformly to all element types — actors, sources, insights, processes, entities, and any future types.

Examples:

When a referenced element doesn’t exist yet, create it first. External people (clients, vendors, interviewees) use Actor with type: external. The CLI makes this fast (ubml add actor).

Alternatives Rejected

Alternative Why Rejected
Ref \| string unions for progressive refinement Two identity systems. Strings become permanent. Violates P1.5.
String-only properties for simplicity No linkage to model. Can’t trace, query, or validate.
Mix of ref-only and string-only by property Inconsistent. Users must remember which properties allow strings.

Principles Applied

Principle How Applied
P1.5 Typed References for Modeled Concepts If the concept is modeled, use the model
P9.1 No Alternative Representations One way to reference a concept
P12.6 Single Provenance Path No side channels that bypass the formal chain

DD-011: Progressive Refinement Strategy

Status: Accepted

Context

Consultants capture knowledge from meetings, interviews, and ad-hoc conversations. Initial capture is messy — names, pains, fragments of process descriptions, contradictory accounts from different stakeholders. The workspace must accept this rough input and guide progressive structuring.

The end goal is effective handover: stakeholders and developers should understand how the business makes money and where optimization opportunities exist. UBML is not designing software — it’s describing how an organization operates so that others can act on that understanding.

Without a refinement strategy, two failure modes emerge:

  1. Too strict — consultants abandon the tool because it blocks rough capture
  2. Too loose — models stay permanently incomplete because nothing guides them toward completeness

Research

We evaluated three approaches to progressive formalization:

Approach How It Works Weakness
Validation mode levels (draft/standard/strict) Suppress errors based on declared mode Hides problems; users never leave draft mode; violates P4.4 if defaulted
Schema-level maturity property Store maturity state on elements Violates P1.3 (computable from present/absent optional properties)
Schema-declared refinement questions Schema metadata defines what’s missing as human-friendly questions Requires tooling to surface questions; questions must be well-authored

Decision

Progressive refinement through schema-declared questions, NOT through validation mode relaxation.

  1. Schema is always strictly validated — structural correctness is non-negotiable. A model with only required fields is valid; optional fields being absent is not an error.
  2. The schema declares refinement questions on each type — human-friendly questions about missing optional information (e.g., “Who is responsible for this step?”, “What triggers this process?”). These are metadata for tooling, not validation rules.
  3. Questions are tiered by impact — core modeling questions first, analytical depth second, traceability third. Tooling surfaces questions progressively to avoid overwhelming users.
  4. Model completeness is always derived, never stored — tooling computes maturity from what’s present in the workspace (P1.3).
  5. Conflicting information coexists in the model via the knowledge layer (Sources and Insights with status tracking). Tooling facilitates hypothesis-driven resolution rather than forcing immediate consistency.
  6. The primary input pattern is unstructured content — consultants drop meeting transcripts, names, pain points, and anecdotes into the workspace. Tooling creates structure, deduplicates, and progressively composes a model.

Alternatives Rejected

Alternative Why Rejected
Validation strictness levels (draft/standard/strict) Hides errors instead of guiding improvement. Users never graduate from draft mode. Violates P4.4 if a default is set.
Schema-level maturity property on elements Violates P1.3 — maturity is computable from what’s present in the model. Stored maturity goes stale.
Relaxed required fields as “draft mode” Masks incomplete models instead of guiding completion. Required fields (P5.2) are already minimal.
Hardcoded refinement logic in code Doesn’t evolve with schema changes. Guidance about model elements should live with the schema, not in application code.

Consequences

  1. Schema carries refinement metadata alongside structural definitions — what’s missing and why it matters
  2. Existing valid models remain valid — refinement questions surface for missing optional information, not for structural errors
  3. Tooling can derive model completeness at any granularity (element, type, workspace) without stored state
  4. Validation output is actionable — phrased as questions (“Who owns this process?”) rather than error codes

Principles Applied

Principle How Applied
P1.3 No Computed Aggregations Completeness derived, never stored
P4.3 Schema Always Fully Validated No draft mode; schema is always strict
P5.2 Required Properties Minimal Required fields already minimal; refinement questions handle the rest
P12.1 Minimal Capture Friction Rough capture is valid; questions guide, never block
P12.7 Progressive Refinement Through Questions Core mechanism for progressive formalization